REMODELING
A Specialized Remodeling Project Management Partner
Minimizing Risks and Maximizing Value
Remodeling projects are inherently comples and high-risk , ofthern constrined by TechBank enhances building and asset value through meticulous planning and systematic management. Remodeling projects are complex and high-risk due to existing structures and user constraints. We conduct thorough investigations, feasibility analyses, and design reviews from the early stages. Efficiency, safety, and quality are ensured through VE/LCC analysis and system improvements. By proactively managing risks, we maximize the economic, functional, and aesthetic value of aging facilities, satisfying both users and project owners.
Remodeling Projects
Client’s Benefits
Acquire desired facilities, confidence on project, optimized resources investment, savings in maintenance cost, improve functionality and performance of facilities, enhanced efficiency of land and space, profit created and assets value increased
Efforts and Technologies of TechBank
Analyze client requirements, thorough survey/check/feasibility study, analyze risks and develop project plan, VE/LCC analysis, analyze project influence factors, schedule and cost management, safety and environment management
Project Area
Expansion to enhance land use efficiency, improve performance of aged buildings, conversion to create added-value and profit, improve residential/business environment, improve functionality of space, improve appearance of building
Remodeling Project Management Services
Identify Client’s Needs
· Identify client’s needs on the use and space
Survey / Check
· Review performance, design and structure of existing building
· Decide remodeling strategy
Develop Operation Plan
· Maintenance / Reinforcement plan
· Review plan applicability and related regulations
Propose Design Alternatives
· Derive diverse improvement plans through design VE
Secure Budget Fund
· Design review considering maintenance cost
· Secure budget considering risks
Pre-survey and Study on the Site
· Identify influence factor in the site
· Check facilities operation schedule
Set Up Construction Plan
· Develop temporary building plan and schedule